student of the year editing process review day 1

the first thing that we did was to transfer the footage that was on the mac book at the front of the classroom. this was very time consuming as the file size was quite big. when this was finished after about half an hour of waiting we then attached our hard drives to our own mac books. there was an issue with doing the editing today as one of my team members was out filming there music video today as this was the only time they could shoot in the location that they required.

 

after the footage transfered from the hard drive to the computer, we decided what format we was going to edit in 720p 25 frames per second, this was so that we got a clear image and there was no lag because we actually shot in full hd, so we needed it to match up. after this we decided which bits of footage we were each going to do, i took the first two days and jake took the second two days, this was so that we had less footage to edit so that we saved a lot more time due to the fact as we didnt have as many videos to cut down. once we cut all the videos down we was going to put them all together to create one video.

seen as though there was so much footage i started to edit down the clips so that they were shorter and much more easy to edit.

 

 

 

 

Leave a comment